Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 45 years, born on 22 October 1979
Astrakhan, I want to relocate, prepared for occasional business trips
Construction manager
Specializations:
- Other
Employment: full time, project work
Work schedule: full day, rotation based work
Work experience 19 years 6 months
June 2018 — currently
7 years 1 month
KazTurboRemont LLP
Atyrau, www.ktr.kz
Construction, Real Estate, Architecture... Show more
Construction manager
Future Growth Project (FGP) – Power Distribution Project / TengizChevroil
TCO Future Growth Project - Wellhead Pressure Management Project is the next expansion of the
Tengiz oilfield. As a part of major expansion on production facilities, the power distribution
infrastructure needs to be improved by the new and modification of existing power overhead lines.
Overhead power lines and buried power & fiber optic cables
Excavation, de-watering, backfilling, foundation installations
Steel tower & concrete pole assembling and installations
Installation of insulator assemblies and conductor attachment hardware
Stringing and tensioning of phase conductors, aerial FOC, OPGWs
July 2017 — June 2018
1 year
ISKER Group
Atyrau, www.isker.kz
Civil Construction Manager
Future Growth Project (FGP) – Orken Village Project / TengizChevroil
The Orken Rotational Village, designed to provide housing to 5000 TCO employees as a part of Future Growth Project, consists 12 Accommodation blocks with clinic, utility, fire station, sport complex, canteens, security and office buildings.
Civil Construction Manager
Provision of all relevant interface description for civil works.
Clarification of Civil work related questions with all other parties in the project.
Supervising Civil team
Subcontractor Management
Managing changes to Engineering scope
Concreting, Roads, Earthworks, infrastructures,
February 2013 — July 2017
4 years 6 months
ISKER Group
Atyrau, www.isker.kz
Construction, Real Estate, Architecture... Show more
Civil Construction Manager
Main Contractor of North Caspian Operating Company (NCOC) – "Eskene West Rail Loading Facilities Project (EWRP)"
Eskene West Rail Project consists of 18 buildings designed for the production, storage and export of Sulphur. The main building is the Sulphur Pastilliation Building, intended for hosting the process activities related with the transformation of the raw Sulphur into pastilles. The final product is finally loaded on freight trains.
Provision of all relevant interface description for civil works.
Clarification of civil work related questions with all other parties in the project.
Managing changes to Engineering scope
Supervising Civil team
Subcontractor Management
Piling, Concreting, Architectural, Roads, Earthworks, Infrastructures
November 2011 — January 2013
1 year 3 months
Tula, www.rencons.com
Construction, Real Estate, Architecture... Show more
QA/QC Manager
SCA Paper Factory Project, Tula - Russia
* Customer relations about quality issues
* Managing Quality team
* Establishing inspection system
* Issuing and revising Inspection test plans
* Issuing Quality Control Plans
* Preparation of Quality Control Records and Logbooks
* Organization of site quality control activities
• Concrete tests & sampling
• Soil tests & Sampling
• Receiving Material inspections
Lafarge Cement Plant Project, Kaluga - Russia
* Customer relations about quality issues
* Managing Quality team
* Establishing inspection system
* Issuing and revising Inspection test plans
* Issuing Quality Control Plans
* Preparation of Quality Control Records and Logbooks
* Organization of site quality control activities
• Concrete tests & sampling
• Soil tests & Sampling
• Receiving Material inspections
http://www.rencons.com/proje_detay.aspx?ID=49
March 2009 — November 2011
2 years 9 months
Bureau Veritas Inspection Ltd.
Atyrau, www.bureauveritas.kz/
QA/QC Civil Inspector
Kashagan Development Experimental Project
The Bolashak onshore oil and gas processing plant built as part of Kashagan project, processes oil and gas from the offshore oil field in the North Caspian Sea.
Quality Control activities on behalf of AGIP Kazakhstan North Caspian Operating Company N.V.
* Performing QC Activities for Asphalt Concrete roads in process area and sampling.
* Backfilling & Compaction test for requirement comply.
* Concrete and reinforced concrete structures
* Check up of rebar and form installation
* Testing and sampling of concrete for construction
* Precast element installations
* Equipment Grouting
* Bitumen covering, heat insulation and various paint
* Reporting non-conformance to QC Engineers
* Acceptance of foundations, area for mechanical installations.
* Reviewing handover dossier package (Kazakhstan Quality System-ACT, ITP requirements and ACS-Automated completion System) for multi discipline
http://www.ncoc.kz/en/gallery/bolashak.aspx
http://www.agipkco.com
November 2008 — March 2009
5 months
Freelance
Turkey
Heavy Engineering... Show more
Railway & Highway Design Consultant Engineer
Consulting to blue-print drawing preparations
Alignment & Cross section designs of various projects.
Implementation of cross-sections on existing projects.
April 2008 — November 2008
8 months
PROYAPI Design Construction Industry & Trading Co.
Turkey, www.proyapi.com/index_en.php
Railway & Highway Design Engineer
* Hydraulic design of the storm water drainage system and preparation of the final design drawings for application of Dargecit-Idil Highway Project (35 km)
* Hydraulic design revisions of storm water drainage system of Baku Bypass Motorway Project (15 km)
April 2007 — April 2008
1 year 1 month
ESER Consulting Engineering Inc.
Turkey, www.eser.com.tr/
Railway & Highway Design Engineer
* Design of vertical & horizontal alignment of Access roads of Erzincan-Erzurum High Speed Railway Project (210 km)
* Design of vertical & horizontal alignment of Access roads of Erzurum-Kars High Speed Railway Project (204 km)
* Environmental analysis and Hydraulic design of various projects and preparation of the final design drawings for application.
* Agri-Patnos Highway Project (83 km)
* Erzurum-Uzundere Highway Project (31 km) ;
* Erzincan-Erzurum High Speed Railway Project ;
* Erzurum-Kars High Speed Railway Project ;
* Preparation of General Layout Plans of culverts of Ankara-Sivas High Speed Railway Project (566 km)
March 2006 — September 2006
7 months
ITAS Construction
Turkey
Site Chief Engineer
Project #1 : KIRIKKALE TUPRAS Refinery DHP/CCR Project
Project #2 : IZMIT TUPRAS Refinery DHP/CCR Project
* Fire Proofing activities by casting concrete.
* Equipment, material & workmanship organizations
* All QA/QC activities
* Subcontractor Management
April 2004 — November 2004
8 months
ISDEM Construction Contracting & Trading Co.
Turkey
Junior Chief Engineer
Project : University Summer Olympiads Mass Housing Cons.
* Assembling subcases and sub frames as the subcontractor of Dogus Construction
Industry Inc.
* Equipment, material & workmanship organizations
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
Dual citizenship : Turkish & Russian
Higher education (bachelor)
2004
Dokuz Eylul University
Civil Engineering, Civil Engineering
Languages
Citizenship, travel time to work
Citizenship: Turkey
Permission to work: Kazakhstan, Russia, Turkey
Desired travel time to work: Doesn't matter