Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 45 years, born on 22 October 1979

Astrakhan, I want to relocate, prepared for occasional business trips

Construction manager

Specializations:
  • Other

Employment: full time, project work

Work schedule: full day, rotation based work

Work experience 19 years 6 months

June 2018currently
7 years 1 month
KazTurboRemont LLP

Atyrau, www.ktr.kz

Construction, Real Estate, Architecture... Show more

Construction manager
Future Growth Project (FGP) – Power Distribution Project / TengizChevroil TCO Future Growth Project - Wellhead Pressure Management Project is the next expansion of the Tengiz oilfield. As a part of major expansion on production facilities, the power distribution infrastructure needs to be improved by the new and modification of existing power overhead lines.  Overhead power lines and buried power & fiber optic cables  Excavation, de-watering, backfilling, foundation installations  Steel tower & concrete pole assembling and installations  Installation of insulator assemblies and conductor attachment hardware  Stringing and tensioning of phase conductors, aerial FOC, OPGWs
July 2017June 2018
1 year
ISKER Group

Atyrau, www.isker.kz

Civil Construction Manager
Future Growth Project (FGP) – Orken Village Project / TengizChevroil The Orken Rotational Village, designed to provide housing to 5000 TCO employees as a part of Future Growth Project, consists 12 Accommodation blocks with clinic, utility, fire station, sport complex, canteens, security and office buildings. Civil Construction Manager  Provision of all relevant interface description for civil works. ‎  Clarification of Civil work related questions with all other parties in the project. ‎  Supervising Civil team  Subcontractor Management  Managing changes to Engineering scope  Concreting, Roads, Earthworks, infrastructures,
February 2013July 2017
4 years 6 months
ISKER Group

Atyrau, www.isker.kz

Construction, Real Estate, Architecture... Show more

Civil Construction Manager
Main Contractor of North Caspian Operating Company (NCOC) – "Eskene West Rail Loading Facilities Project (EWRP)" Eskene West Rail Project consists of 18 buildings designed for the production, storage and export of Sulphur. The main building is the Sulphur Pastilliation Building, intended for hosting the process activities related with the transformation of the raw Sulphur into pastilles. The final product is finally loaded on freight trains.  Provision of all relevant interface description for civil works.  Clarification of civil work related questions with all other parties in the project.  Managing changes to Engineering scope  Supervising Civil team  Subcontractor Management  Piling, Concreting, Architectural, Roads, Earthworks, Infrastructures
November 2011January 2013
1 year 3 months

Tula, www.rencons.com

Construction, Real Estate, Architecture... Show more

QA/QC Manager
SCA Paper Factory Project, Tula - Russia * Customer relations about quality issues * Managing Quality team * Establishing inspection system * Issuing and revising Inspection test plans * Issuing Quality Control Plans * Preparation of Quality Control Records and Logbooks * Organization of site quality control activities • Concrete tests & sampling • Soil tests & Sampling • Receiving Material inspections Lafarge Cement Plant Project, Kaluga - Russia * Customer relations about quality issues * Managing Quality team * Establishing inspection system * Issuing and revising Inspection test plans * Issuing Quality Control Plans * Preparation of Quality Control Records and Logbooks * Organization of site quality control activities • Concrete tests & sampling • Soil tests & Sampling • Receiving Material inspections http://www.rencons.com/proje_detay.aspx?ID=49
March 2009November 2011
2 years 9 months
Bureau Veritas Inspection Ltd.

Atyrau, www.bureauveritas.kz/

QA/QC Civil Inspector
Kashagan Development Experimental Project The Bolashak onshore oil and gas processing plant built as part of Kashagan project, processes oil and gas from the offshore oil field in the North Caspian Sea. Quality Control activities on behalf of AGIP Kazakhstan North Caspian Operating Company N.V. * Performing QC Activities for Asphalt Concrete roads in process area and sampling. * Backfilling & Compaction test for requirement comply. * Concrete and reinforced concrete structures * Check up of rebar and form installation * Testing and sampling of concrete for construction * Precast element installations * Equipment Grouting * Bitumen covering, heat insulation and various paint * Reporting non-conformance to QC Engineers * Acceptance of foundations, area for mechanical installations. * Reviewing handover dossier package (Kazakhstan Quality System-ACT, ITP requirements and ACS-Automated completion System) for multi discipline http://www.ncoc.kz/en/gallery/bolashak.aspx http://www.agipkco.com
November 2008March 2009
5 months
Freelance

Turkey

Heavy Engineering... Show more

Railway & Highway Design Consultant Engineer
Consulting to blue-print drawing preparations  Alignment & Cross section designs of various projects.  Implementation of cross-sections on existing projects.
April 2008November 2008
8 months
PROYAPI Design Construction Industry & Trading Co.

Turkey, www.proyapi.com/index_en.php

Railway & Highway Design Engineer
* Hydraulic design of the storm water drainage system and preparation of the final design drawings for application of Dargecit-Idil Highway Project (35 km) * Hydraulic design revisions of storm water drainage system of Baku Bypass Motorway Project (15 km)
April 2007April 2008
1 year 1 month
ESER Consulting Engineering Inc.

Turkey, www.eser.com.tr/

Railway & Highway Design Engineer
* Design of vertical & horizontal alignment of Access roads of Erzincan-Erzurum High Speed Railway Project (210 km) * Design of vertical & horizontal alignment of Access roads of Erzurum-Kars High Speed Railway Project (204 km) * Environmental analysis and Hydraulic design of various projects and preparation of the final design drawings for application. * Agri-Patnos Highway Project (83 km) * Erzurum-Uzundere Highway Project (31 km) ; * Erzincan-Erzurum High Speed Railway Project ; * Erzurum-Kars High Speed Railway Project ; * Preparation of General Layout Plans of culverts of Ankara-Sivas High Speed Railway Project (566 km)
March 2006September 2006
7 months
ITAS Construction

Turkey

Site Chief Engineer
Project #1 : KIRIKKALE TUPRAS Refinery DHP/CCR Project Project #2 : IZMIT TUPRAS Refinery DHP/CCR Project * Fire Proofing activities by casting concrete. * Equipment, material & workmanship organizations * All QA/QC activities * Subcontractor Management
April 2004November 2004
8 months
ISDEM Construction Contracting & Trading Co.

Turkey

Junior Chief Engineer
Project : University Summer Olympiads Mass Housing Cons. * Assembling subcases and sub frames as the subcontractor of Dogus Construction Industry Inc. * Equipment, material & workmanship organizations

Skills

Skill proficiency levels
Construction Management
AutoCAD
MS PowerPoint
Visual Basic
MS Office
MS Visual Basic
Google Chrome
Microsoft Access
Time management
Teambuilding
Quality Management
Quality Control
Oil And Gas
Engineering
APM Civil Engineering

Driving experience

Own car

Driver's license category B

About me

Dual citizenship : Turkish & Russian

Higher education (bachelor)

2004
Dokuz Eylul University
Civil Engineering, Civil Engineering

Languages

TurkishNative


EnglishC2 — Proficiency


KazakhA1 — Basic


RussianC1 — Advanced


Citizenship, travel time to work

Citizenship: Turkey

Permission to work: Kazakhstan, Russia, Turkey

Desired travel time to work: Doesn't matter