LEAD ICSS/ UCP ENGINEER
3 500 $ in hand
Specializations:
- Other
Employment: full time, project work
Work schedule: full day, shift schedule, rotation based work
Work experience 14 years 11 months
November 2021 — currently
3 years 7 months
Novarctic SNC
astrakhan.hh.ru/employer/4433691
Oil and Gas... Show more
LEAD ICSS\UCP ENGINEER
The Arctic LNG 2 project will consist of three liquefaction trains capable of producing 19.8 Mtpa of liquefied natural gas (LNG).The project has been set up in the Gydan Peninsula in
the western Siberia region of Russia.
- Read and understand project standard and overarching project procedure, including HSSE and Technical Method statement
- Assess and ensure System competencies are proven before involving any parties in energization or live
test.
- Ensure that all live equipment (Cabinet, cables, boards, JB..) are identified and / or properly isolated from construction systems
- Utilize completion management system (EASYPLANT), for the preparation, execution and monitoring of
discipline Commissioning activities
- Provide assistance to area Process Supervisors/engineer for the execution of P&ID System OTP
- Based on ITP execute the work as per instruction received from Superintendent.
- Report any non-conformity and ensure proper action is taken (focal point assigned, and actions
understood) Ensure PTW are valid when work is executed (when applicable)
- Maintain log book for by pass, override and simulated signals, and ensure that they are removed before energization and Handover
- Perform Contoller tuning and assistance to panel operator in day ot day operation.
- Follow-up with ICSS vendor the maintenance and backup of logics and parameters.
- Support implementation of new improvements in process control systems through Advanced Process
Control, Alarm Management, and Operator Interface Optimization.
- Perform construction completion check-up, inspection cold SAT and energization of vendor PLC. Check
communication and perform Hot SAT.
- Configuring and supporting PCS (C300, Control builder) , SM (S300, Safety Builder ), MYT during in Loop check, then Funtional Test.
- Configuring Cisco (Catalist 9200l 24 4x1G) for HONEYWELL FTE Network
- Configuring QBDB and Master Logix, PCDI for make communication with VSD (ABB), Schneider. P3 packages.
May 2018 — October 2021
3 years 6 months
Caspian Pipeline Consortium
Astrakhan, cpc.ru
Oil and Gas... Show more
Control System and SCADA Engineer
CJSC “CPC-R” – major international crude oil transportation project with participation of Russia, Kazakhstan and leading world mining companies such as Chevron, Shell, ExxonMobil, Eni, British Gas, Rosneft, LUKOIL), created for the construction and operation of trunk pipelines with a length of more than 1.5 million. Km.
Control System and SCADA Engineer, Functions:
- Troubleshooting of control systems equipment 24/7.
- Implementation all applicable Project and company MOC procedures and protocols
- Contents hardware and software system administration in accordance with the internal regulations and instructions of the company.
- Control of correctness of control system equipment operation by users.
- Establishment and maintenance of classifier of the internal stock of spare parts for the control system equipment hardware and software.
- Organization complicated major repairs of control system equipment hardware and software, with the approval of the Control Systems Team Leader, using procedures such as post-repair control and acceptance of such equipment.
- Consultation users of equipment and control systems including maintenance of operations manuals and procedures.
- Creating SQL queries to analyze the causes for emergency shutdown Pump Station and equipment failure.
- Maintenance records and performance review of control system equipment failures, and develop programs to eliminate the causes behind such failures.
- Save backup copies of Control systems software.
- Training of personnel on how to use control systems interface.
September 2012 — April 2018
5 years 8 months
Caspian Pipeline Consortium
Astrakhan, cpc.ru
Control System and SCADA Engineer
- Review, preparation of answers and comments, as well as the coordination, if necessary, of explanations for design decisions, bills of materials ,calculations, P&ID and other documentation for Network, Control Systems and Instrumentation Systems, taking into account the design requirements and the need to introduce optimal design and technological implementation.
- Participation in Factory acceptance testing of equipment for the control systems, telecommunications of new objects CPC.
- Develops work plans and procedures for execution of control systems Pre-commissioning and Commissioning activities.
- Supervision of the LCS contractor’s activities on site.
- Develops of Pre-commissioning and Commissioning procedures.
- Loop checks processing for the signals from the field to SCADA
- Technical support to the General Contractor in order to process requests for approval of technical deviations during commissioning of instrumentation;
- Interaction with contractors in order to resolve current issues and advance the progress of commissioning of instrumentation;
- Ensuring compliance with HSE rules and regulations at the construction site, as well as minimum HSE requirements;
- Functional logic testing, integrated testing of GPP, ESD Control and F&G (SES-ASA, DETRONICS) detection of new CPC Pumping Stations.
- Implementing project modifications with RSLogix, S7, PCS C300, Wonderware, FactoryTalk View SE (HMI), iFix, OaSys (SCADA)
- Installation vibration diagnostics system BentleyNevada 3500, System 1
- Interfacing with field engineering contractors and Start Up and Commissioning organizations during equipment SAT and operational acceptance
- Review of Design Drawing, vendor documentation, RFIs, change proposals of Control Systems, Telecommunications contractors.
- Coordination of authorship supervision activities to make sure of an appropriate design documentation to be in “As build” format.
- Site acceptance and control systems testing of the auxiliary systems: HVAC, Water Treatment; Diesel Electrical Station etc.
- PS logic control issues resolving to comply with technology and safety requirements
- Main Line Pumps Start-Up and Commissioning (LCS&SCADA)
- Coordination of activities in the interfaces with Telecomm, SCADA and security systems
- Providing information on the progress of work to the planning group of the Company;
- Commissioning of remaining equipment (ongoing).
July 2010 — August 2012
2 years 2 months
CJSC SAAB RADAR MASTER
Moscow, radarmaster.ru
Oil and Gas... Show more
Lead engineer
“Saab Radar Master” – The company specializes on supplying and implementation of measuring and controlling systems Rosemount TankRadar L/2, produced by Rosemount Tank Gauging company (Sweden) for tank parks, petrogas-processing enterprises, enterprises of pipeline transport of oil and gas, port terminals, oil and gas fields. “Saab Radar Master” company is an official representative of such famous equipment manufacturers as Rosemount Tank Gauging, Ametek DrexelBrook, Controlotron and others.
Start and adjustment engineer. Areas of expertise:
- Equipment installation.
- Software configuration
- Setting up data transmission from system Saab Radar Master into high level systems
- Level measuring channel adjustment according to the manufacturer instruction
- Calibration and equipment checking
- Maintenance operation
- Maintenance of project documents
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
Hardworking. Dedicated, and Highly motivated technical professional, combined with extensive knowledge of Industrial Automation domain. Having 11 yrs of rich experience al stages of Industrial Automation Projects: starting from Pre-Project Engineering till final handover to customer and service. Looking to fill the position where my skills can be an asset to the company.
Higher education
2011
Automation and Computer Engineering, Automation of technological processes and production in the oil and gas industry / Master
2009
Faculty of Chemical Technology, Automation of technological processes and production in the oil and gas industry/ bacelor
Languages
Professional development, courses
2017
Custom Ethernet and ControlNet Maintenance and Troubleshooting, +Redundant Control System
Rockwell Automation, PLC
2017
Local Control Maintenance Training
ENGLOBAL, HMI
2016
«RSLogix 5000 Level 1: ControlLogix/CompactLogix» training course.
Rockwell Automation, PLC
2016
«MicroLogix 1500 - Bases RSLogix 500 systems and methods for troubleshooting» training course
Rockwell Automation, PLC
2014
"ControlNet" training course
Rockwell Automation, PLC
2011
Commercial accounting system "Raptor"
Emerson, Gothenburg, Metering Skit
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia