Sakhalin Oblast, www.sakhalinenergy.ru
Maintenance Planner / Scheduler / SAP CMMS Engineer and Support Focal Point
EN:
Maintenance Planning: Populate, update and maintain the CMMS/SAP system used on the LNG facility.
Providing accurate detailed reports downloaded from the CMMS/SAP system used on Sakhalin Energy LNG facility.
Detailed planning of labor requirements and parts availability.
Ensure work orders (PM plans) and workscopes are created for each item on the asset register.
Work with the discipline engineers to correctly identify spare parts, critical spare parts and quantities required. Considering location, lead team and budget constraints and parts optimization.
Produce detailed weekly and monthly reports on maintenance activities against the set Key Performance Indicators (KPI)
Collect and analyze data required for your input in the development of the maintenance budget.
-Work with the discipline engineers to build a maintenance strategy that covers the current and future maintenance activities for the LNG plant.
Ensure that all LNG facilities are timely maintained to uphold valid certificates, permits etc. issued by regulatory and inspection agencies. Working with disciplines with successful implementation of RBI, RCM and IPF strategies.
Scheduling: All LNG areas Integrated scheduling for 15 disciplines: 3Days Look Ahead,14DLAH,
90DLA, 52WLA jobs scheduling utilizing prioritization tools, risk management and principles of MIE SHELL standards.
Resource levelling.
Weekly Overdue jobs reporting using SAP BW (Top Level Measures)
Jobs implemented in compliance with Shell Maintenance Integrity Execution Program
Standards (MIE) as part of Global Shell Operational Excellence program.
CMMS support and coach role regarding all maintenance issues. i.e. raise notification,
Work Order lifecycle: Create Work Order, Work preparation, Work confirmation and
Technical Completion. Facility Status Report system to control SCE jobs and risks
customer support.
All changes execution in CMMS on Master Data change request Notifications:
Functional Locations create/change, Maintenance Plans create/change, Maintenance
Items, BOM creation, etc..
Maintaining and reporting on Corrective and Preventive Jobs Backlog and other
Execution Performance KPI’s. SCE elements identification.
Additional / Temporal Responsibilities:
Standing for Team Leader (Senior Maintenance Support Engineer) managing team of 2
Planners and 5 Work Preparers. Leading weekly Planning Team meetings, Production
Directorate Performance meeting department representation. Monthly Reliability
Meeting (Planning KPIs section representation), etc.
Purchase Requisitions creation in SAP.
Acting as a backup (supportive) Shutdown Planner during turnarouns.
RU:
Позиция: Инженер по планированию техобслуживания.
Месторасположение: Россия. Сахалин. Завод СПГ.
Изменение Основных Данных в SAP, функциональное месторасположение
Привязка материалов, составление и запуск в системе ППР, и т.д. (Все работы связанные с изменением основных данных системы САП).
Составление и ведение 3х, 90, 14ти дневных и годовых графиков работ для всех производственных зон завода СПГ, распределение ресурсов с учетом загруженности и критичности работ, проведение ежедневных совещаний с целью отслеживания прогресса выполнения работ в соответствии с графиком.
Контроль за обновлением данных из Примавера в САП через Impress и обратно.
Составление в САП заказов на сервисы/услуги сторонних организаций.
Планирование производится в соответствии со стандартами MIE компании Шелл.
Дополнительные/Временные обязанности:
Выполняю функцональные обязанности Старшего Инженера Службы поддержки Техобслуживания.
Выполнял функции специалиста по планированию капремонта на время ежегодного останова завода СПГ.